Sergeant Means Park Phase Two
Work will include: site preparation, construction fencing, temporary soil erosion and sediment control, site removals and clearing, earthwork, excavation, and grading, cast-in-place concrete foundations and footings, pedestrian asphalt paving, sport court asphalt paving (color coat and striping), pedestrian concrete paving, picnic shelter installation, permanent lawn games, landscaping, native seed planting, and turf seed restoration.
Bid Set - Drawings
(click to expand/collapse)

Name | Size | ||
REV 01 plans 20250218 sgt means ph-2_bid | 27.1 MB |