Addison Community Center Park Final Design

The Addison Park District does hereby invite sealed bids for Community Center Park Final Design. Work will include site clearing, earthwork operations, subdrainage, utilities, asphalt paving, concrete curbs, walks and paving, site furnishings, fencing, planting, and seeding.

Status

Bidding Closed

Bid Date 5/23/24 10:00am

Company & Contacts

Hitchcock Design Group
Bridget Deatrick  
630-961-1787

Location

Addison, Illinois 60101

Community Center Park Final Design

The Addison Park District does hereby invite sealed bids for Community Center Park Final Design.

Work will include site clearing, earthwork operations, subdrainage, utilities, asphalt paving, concrete

curbs, walks and paving, site furnishings, fencing, planting, and seeding.

Project manuals, including bid form and specifications, and construction documents are available after

10:00 AM on May 2, 2024, from Accurate Reprographics 2368 Corporate Lane, Suite 100, Naperville,

Illinois 60563, 630.428.4433 www.hitchcockplanroom.com. Bidding documents are available to download

and print at the non-refundable cost of reproduction.

Bids will be accepted at the Addison Park District 120 East Oak Street, Addison, Illinois 60101, during

regular office hours. All bids must be submitted in a sealed envelope marked with the Contractor’s name

and address, and “Bid for Community Center Park Final Design,” on the face of the envelope. Bids must

be received no later than 10:00AM. Bids will be opened on 10:01 AM on May 23, 2024, at the Addison

Park District offices, 120 East Oak Street, Addison, Illinois 60101. All bidders will be required to submit

Bid Security in the form of a Bid Bond, Certified Check, Cashier’s Check in the amount of 10% of the

Base Bid, payable to the Addison Park District.

The successful bidder, as determined by the Addison Park District, shall be required to pay, and to agree

to pay no less than the Prevailing Rate of Wages, pursuant to the Illinois Prevailing Wage Act (820 ILCS

130) for the locality of the Addison Park District (DuPage County), to each laborer worker, or mechanic

needed or used to complete the work as detailed in the contract to be let. The successful contractor, and

all subcontractors shall be required to submit, to the Addison Park District, certified payrolls no later than

the tenth day of each calendar month for the immediately preceding month.

The Addison Park District reserves the right to reject any and all proposals, parts of any and all proposals,

or to waive technical errors or omissions in submitted proposals. No submitted bid may be withdrawn

until a period of sixty (60) days after the bid opening date, without written consent of the Addison Park

District. The Addison Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment,

services, and construction.

Questions should be directed to Joe Brusseau and Bridget Deatrick, Hitchcock Design Group at

630.961.1787, jbrusseau@hitchcockdesigngroup.com pand bdeatrick@hitchcockdesigngroup.com

This project is being financed, in part, with funds from the Illinois Department of Natural Resources,

“Open Space Land Acquisition & Development” (OSLAD) grant program.