Renfrew Park Phase One
Status
Bidding Closed
Prebid Date | 2/3/25 1:00pm |
Bid Date | 2/18/25 1:00pm |
Location
Dwight, Illinois 60420
The Village of Dwight does hereby invite sealed bids for Renfrew Park Phase One. Work will include
temporary soil erosion and sediment control, site preparation, earthwork, subsurface drainage, asphalt
paving, concrete paving, curbs, and footings, picnic shelter installation, playground and fitness equipment
installation, play surfacing (engineered wood fiber and poured-in-place rubber), sport court color coating,
chain-link fence, tennis and pickleball net and post installation, site furnishing installation, turf grass
seeding and landscaping.
Project manuals, including bid form and specifications, and construction documents are available after
11:00 am on January 29th, 2025, from Accurate Reprographics 2368 Corporate Lane, Suite 100, Naperville,
Illinois 60563, 630.428.4433 or www.hitchcockplanroom.com. Bidding documents are available at
the non-refundable cost of reproduction for each bid package.
Bids will be accepted at the Village of Dwight, 209 S. Prairie Ave, Dwight, Illinois 60420, during regular
office hours. All bids must be submitted in a sealed envelope marked with the Contractor’s name and
address, and “Bid for Renfrew Park Phase One,” on the face of the envelope. Bids must be received no
later than 1:00 pm on February 18, 2025. Bids will be opened on February 18, 2025, at 1:01pm at 209 S.
Prairie Ave, Dwight, Illinois 60420. All bidders will be required to submit Bid Security in the form of a
Bid Bond, Certified Check, Cashier’s Check in the amount of 10% of the Base Bid, payable to the Village
of Dwight.
The successful bidder, as determined by the Village of Dwight, shall be required to pay, and to agree to
pay no less than the Prevailing Rate of Wages, pursuant to the Illinois Prevailing Wage Act (820 ILCS
130) for the locality of the Village of Dwight (Livingston County), to each laborer worker, or mechanic
needed or used to complete the work as detailed in the contract to be let. The successful contractor, and
all subcontractors shall be required to submit certified payrolls online no later than the tenth day of each
calendar month for the immediately preceding month.